Cooling the 900 m2 auto workshop , for trucks in Kuwait to increase employee performance
The Fuso truck workshop required a cooling solution as the temperatures would exceed 48C during the summer, and employee performance and efficiency would drop during this period. Employees get tired and require longer rest periods. The heat also affected the tuning and calibration equipment as they misbehave .
The choice to deploy Breezair was due to the low power consumption, did not require all the entrances to be closed at all times as in the case of AC If an AC solution had to be used it would require huge power requirement which was not available in the building along with . The Breezair solution blended with the current operation of the workshop giving the employees at the work bay cool comfortable working conditions, even when it was a scorching 48C outside.